"done" file for work after 2000. JB=Jim Blecksmith (handyman), DL=David Lawyer, CM=Chuck McKinnon Patch bottom of S. main entrance door. Obtain wood with similar grain and fit it in so that patch is almost invisible. This door is of architectural significance. 7hr$10 2002: CM put kickplate over hole '02 Church Roof: Renailed loose shingles and replaced damaged shingles. All except N sanctuary. by DL: Dec. 24 '02 to Feb. 3, `03, Cost includes cost of mountain climbing gear (Yates harness cost $120), field and ridge shingles, nails, caulk, etc. 70hr$250. Used about 1,700 nails. Paint cracked decorative wood beam by Del Mar. 15hr$30 by JB Mar.'03 6 hr$15 Paint many church window sills. by JB Mar. '03 Paint exterior door to choir room. 1hr$3 by JB Mar. '03 1hr$3 Paint exposed exterior decorative rafters on 4 gables (N gable excluded since it's OK). 30hr$40 by DL (JB did 1/2 gable) Mar.'03 23hr$25 (would have been 20 hrs. if paint not spilled on roof) Replace 3 @ Clerestory window shade rollers on far E. side. 6hr$150 by DL Feb.-Apr. '03 10hr$130 (for all 3) Garbage disposal water didn't turn on. Cleaned solenoid plunger. 3hr$20 by DL Feb. '04 4hr$0 Turn-off valve for garbage disposal didn't fully turn off. Estimate was for repair but had to replace valve. 2hr$4 by DL Feb. `04 2hr$8 Renailed shingles on steep N. sanctuary roof 8hr$2 by DL Feb. '04 (watched and assisted by Ken Mehaffy) 18hr$7 Repair old Fireside Rm. door and install. 5hr$10 by DL and JB May '04 9hr$15 Throop Hall to patio door, far S one which is no longer used as a door. It's badly damaged and will not close. Repair. 6hr$50 By JB Spring '04