Windows THROOP WINDOWS (including SILLS, THRESHOLDS & LOUVERS by David S. Lawyer Created: Jan. 1992. Condition such as "good" is as of 1994. Abbreviations: IP = In progress double => one sill, 2 windows Off. = office triple => one sill, 3 windows Rm. = room quintuples (Quints.)5 windows Th. = threshold Fl. = floor TOWER (A belfry louver window:13 slats @ 3'=39') DESCRIPTION FT. CONDITION/DATE FIXED N. 2 @ 39' 78 fair Jan.'03 8hr E. 2 @ 39' 78 bad S. 2 @ 39' 78 bad W. 2 @ 39' 78 bad Subtotal 312 Upper Tower Rm. W. 1 @ 2' 2 Dec.'93 8hr E. triple 1 @ 6' 6 Dec.'93 17hr Subtotal 8 Tower Rm.(S. face)3 @ 1' 3 replaced by plywood WEST SIDE Double 1 @ 4' 4 good Single 2 @ 2' 4 good Slit Windows 5 @ 3/4' 4 good Basement Louvers 42@1.33' 56 good Vent Sills 7 @ 1 1/2' 10 good Subtotal 72 SOUTH SIDE (W. end) Choir Rm (triple) 1 @ 7' 7 June'95 6hr Subtotal 7 SOUTH SIDE (W. facing near steps) Office (double) 2 @ 4' 8 Oct.'94 14hr Fireside Rm. 1 @ 6' 6 Sept.'94 8hr Subtotal 14 SOUTH SIDE (close to Del Mar street) Fireside Rm. 2 @ 8' 16 Feb.'95 8hr Women's Rest Rm. 4 @ 2' 8 Sept.'94 8hr Offices 3 @ 2' 6 Oct.'94 12hr 1 @ 4' 4 Oct.'94 11hr Minister's Off. 1 @ 6' 6 Summer'95 Basement Louvers 33 @2.33 77 '95 by John Miller Subtotal 123 EAST SIDE (kitchen & minister's office) Minister's Off. 2 @ 3' 6 '95 by Jim Stiver " " (triple) 1 @ 8' 8 '95 by Jim Stiver Kitchen 2 @ 3.5' 7 Sept.'94 Kitchen Door Th.1 @ 3' 3 Sept.'94 2hr Subtotal 24 EAST SIDE (N. facing (kitchen) Kitchen 3 @ 3' 9 good Minister's Off. 1 @ 5' 5 good Upper Stairwell 1 @ 5' 5 good Min. Balcony Parapet 30 fall'93 & Feb'95 Subtotal 49 EAST SIDE (Throop Hall & above) Door Thresholds 4 @ 7.5' 30 Sept.'94 but bad Transoms Sills 4 @ 7.5' 30 2 bad, 2 Nov'95 2nd Fl. doubles 2 @ 4' 8 Nov'95 2nd Fl. Quints. 2 @ 11' 22 Oct-Dec'95 50hr Stage 3 @ 4' 12 2 good, Oct.'95 Subtotal 102 NORTH SIDE (except clerestory) North Room(long)1 @ 17' 17 good (Touch up 1 hr Sept. '94) Basement 4 @ 2' 8 good (Making contact with dirt.) Basement Cover 1 @ 12' 12 replaced by Montessori July '96 Stage Door Th. 1 @ 3' 3 done Sept.'95 by John Miller 5hr$7 Doubles 1 @ 4' 4 good Triples 3 @ 6' 18 good Subtotal 70 Time in hr includes time repairing window sash & frames. Replacement of belfry wood is fairly easy to do. Sill thickness 2" to 2 1/2 " All-copper sills 60 ft. Wood Window Sills 249 ft. WOOD SILLS: Total 249 ft.(58) Basement louvers 143 ft. good: 102 ft. (24) as of 1993 Tower louvers 312 ft. IP: (was not done) Parapet, Min. balcony 30 ft. fixed 139 ft (29) after 1993 Thresholds 36 ft. badNow (1994) 18 ft (5) Grand total of wood: 770 ft. bad92 157 ft. (34) as of 1993 fixed 89% of ft., 85% of No. THRESHOLDS: fixed 36 ft(but 15 ft failed CLERESTORY all copper sills: N. Side 7 @ 5' 35 S. Side 5 @ 5' 25 (fewer due to tower) 60 (2003: clerestory frames, S. side stained, and repaired with caulk nails All windows are wood except for metal in first floor choir Rm. All are casements (inward opening) with multiple lights. How to repair damaged window sills and door thresholds? In 2003 used solid color stain as it's less likely to peel. Have a note about using "soft epoxy" filler that stays soft. What is it?